Land Use and Physical Features
- Land Use Mapping and Report
- Physical Features Mapping
- Yellowstone River Human Impacts Timeline (2008)
This documents the development of flooding and erosion control structures through time in the Yellowstone River corridor. Determination of the approximate construction dates for features such as dikes, levees, riprap, and transportation infrastructure encroachment on the floodplain was accomplished using Historic Aerial Photography.
- Yellowstone River Historic Events Timeline (2008)
This provides tabulated summaries of historic occurrences in the river corridor related to bridge construction, irrigation structures, ice jam formation, natural grade control removal, and flooding. The information is intended to support the development of a timeline that describes the progressive construction of numerous types of physical features within the river corridor (see Yellowstone River Human Impacts Timeline), along with timing of natural events such as floods and ice jams.
Yellowstone Clearinghouse Home
Yellowstone River Final Reports
- Cumulative Effects Analysis (CEA)
- CEA Technical Appendices
- CEA Executive Summary
- Reach Narratives
- Recommended Practices and Position Statements
- Governor's Upper Yellowstone Task Force (1997-2003)
Maps
- Online Map Viewer
- Reach Story Map 1: Overview
- Reach Story Map 2: Details
- Yellowstone Reference Maps
- Maps Selected from Technical Reports
Data and Technical Reports
- Imagery and Topographic Mapping
- Hydrology and Hydraulics
- Land Use and Physical Features
- Geomorphology
- Biology
- Socioeconomics
- List of Available GIS Data
Contact Info